Tiling A Basement Concrete Floor

865 views

Tiling A Basement Concrete Floortime lapse of a 16x16 ceramic tile installation on a basement


Tiling A Basement Concrete Floor - Installing ceramic tile flooring could be achieved by anyone with good eyesight (or glasses), who has the physical state required to scrub, scrape, kneel, and flex. You'll have to be careful enough to handle a wet tile saw or utility knife. And patient to smooth mortar evenly, yet. You'll want several hours, depending on how big the floor, as two or three hours are required to dry and you've got kids and if the floor is a toilet, a second toilet that they'll use might come in handy.

You'll require the title, of course. Your choice of design is completely your own, but consider the way the design will fit in with all the remaining part of the space. Consider, also, the function of the room. Kitchen floorings are always exposed to food and water drips. Dark ceramic tile flooring would tend to make seeing these drops more challenging when you're mopping the floors. Light, solid colours are most proper for kitchen floors, while darker tile with uncomplicated patterns go finest in toilets.


After you've got your tile, you can pre-cut tiles which is placed at the borders of the floor if the tile is too large. What this means is you should do some measuring first. The mortar which is only partially dried mightn't bond with all the tile when it was place by you.

You'll additionally want mortar and grout to place your ceramic tile flooring. You'll also need a trowel to spread the mortar or adhesive by which you place the tile, and also a wet tile saw to cut tile when demanded. You can also use spacers which separate the tiles from each other in an even manner.

Tags: #tile basement floor cement board #tile for basement concrete floor #tiling a basement floor drain #tiling a basement floor with cracks #tiling painted concrete basement floor